In my current case I want to create a task and link it to a desired result (in the dropdown field). But I don’t want to show the desired results that were already achieved.
Are you talking about being able to create entities of a related type, when submitting a form for a given type?
Ermm.. I didn’t think of this that way.
Here’s an example of a workaround I’m building to at least get an idea about the sprint date range the desired results belong to. And still it’s just a mess cause the list in the dropdown isn’t ordered by date. But I’d love to hide the irrelevant data all together without the need for such tricks.
But I think the dependent fields functionality could help here too.
OK, gotcha.
Seems related to this topic:

